01
Attic Recon
We climb into the attic first, not onto the roof. Using a moisture meter and infrared camera, we map rafters, check for existing roof leaks, and confirm the opening lands between framing members. You get a written placement plan and a firm price before we cut anything. Takes 30 to 45 minutes.
02
Interior Protection
Drop cloths go down over furniture and flooring. We cut the drywall ceiling opening from below with a utility knife and drywall saw, then bag all debris. Most customers stay in the house during the work. The interior cut takes about an hour for a standard 2x4 unit.
03
Curb Framing and Decking
We build a code-correct curb from dimensional lumber, sistering rafters where needed and securing everything with a roofing nail gun. Roof decking gets cut clean with a shingle ripper and pry bar. The curb sits plumb and square so the unit drops in without shimming. This step runs two to three hours.
04
Flashing and Unit Set
Ice and water shield goes up the curb sides first. Then we set the Velux or Owens Corning unit on a continuous bead of roof sealant and lock down step flashing with the shingle courses. Every fastener gets sealed. We use a chalk line to keep flashing courses straight so the finished roof looks factory-original.
05
Water Test and Walkthrough
We run a hose test on the roof for 15 minutes while checking the interior for moisture. Then we walk you through the unit, the flashing detail, and the warranty paperwork. You get photos of every stage. If anything reads wet on the moisture meter, we fix it before we leave.